Extensive refurbishment of existing Design and Technology Block in this comprehensive school with approximately 780 students aged from 11 to 19.
New electrical power distribution to supply existing workshop machinery.
Power and supplies to 5 no. classrooms upgraded to allow increased numbers of PCs in the classroom.
New dust extract to 3 no. workshops
EPO’s to shut off all machinery in each workshop while allowing the dust extract to continue operating.
New radiator system to ground floor to match the existing on first floo