Menu

Anchor System For Hotels Buildings

FP McCann's pipes from DN1350 upwards should be handled using our purpose-built anchor system. Special lifting anchors are cast into pipes at manufacture. A universal head link (available from FP McCann) can then be hooked onto the exposed anchor heads to lift the pipe. Use the equal lengths (A & B) for lifting the pipe. Join the longer chain (C) onto the pipe already laid and place the shorter length (B) onto the hook. The pipe can then be jointed without moving the jib of the crane.

Visit the FP McCann website for more information on Anchor System For Hotels Buildings

ENQUIRY FORM

More Products

  • UK Suppliers Of Prestressed Horizontal Panels For Education Buildings

  • UK Suppliers Of Smoothbore Shaft Linings For Education Buildings

  • UK Suppliers Of Rocket Walls™ For Education Buildings

  • UK Suppliers Of L Walls For Education Buildings