UB 282 Antrim Street Bridge, Lisburn, carries the main Belfast to Dublin railway over Antrim Street, at Lisburn. The bridge supports three tracks, two of which on the south side are supported on the original structure and the third set on the north side is supported on the widened section of the bridge. UB 282 had a history of reported bridge strikes. This project was to install Collision Protection Beams on both the north and south elevations.