Menu

A4 Faughard 2 + 1

A4 Faughard 2 + 1

The works comprised of widening both sides of an existing 7.3m carriageway to over 12m wide over a length of 1.8km. This was to provide overtaking opportunities on the uphill Maguiresbridge bound direction.

Visit the FP McCann website for more information on A4 Faughard 2 + 1

ENQUIRY FORM

More Products

  • FP Mccann'S Precast Drainage Products Utilised On Magherafelt Based Housing Development

  • FP Mccann'S Precast Concrete Stormtank Installed On Wakefield Housing Development

  • FP Mccann'S Precast Drainage Systems Installed On Cambridgeshire Housing And Community Project

  • FP Mccann'S Precast Concrete Jacking Pipes Utilised On Cumbrian Flood Alleviation Scheme