When Does a Scaffold Need a Design Beyond TG20
When Does a Scaffold Need a Design Beyond TG20
Access Design & Safety is a specialist scaffold design consultancy based in Dudley. We provide when does a scaffold need a design beyond tg20 for scaffolding contractors, principal contractors and temporary works coordinators across the UK.
Not every scaffold can be built to the TG20 compliance sheet. Once you add sheeting, heavy loads, unusual shapes or poor ties, you need a proper design. That is what we do, every day.
When Does a Scaffold Need a Design Beyond TG20: Getting It Right First Time
A good scaffold design does more than tick a box. It tells the erectors exactly what to build, keeps the material count sensible and gives the principal contractor confidence that the structure will do its job.
What Our Scaffold Design Service Includes
- Scaffold, falsework and formwork design drawings and calculations
- Wind loading analysis to EN 1991-1-4
- Design to BS EN 12811-1 and cu
Why Choose Access Design & Safety
Since 2010, Access Design & Safety has built its reputation on getting the engineering right. We are fully insured, NASC design members and associate members of the Scaffolding Association, and we work with contractors right across the UK.
Arrange Your Scaffold Design
Get in touch today on 01384 459090 or at info@designsafe.co.uk. We are based in Dudley, West Midlands, and work on projects throughout the UK.
Visit the Access Design and Safety Ltd website for more information on When Does a Scaffold Need a Design Beyond TG20