Scaffold Design Check for Temporary Works Coordinators

Scaffold Design Check for Temporary Works Coordinators

Looking for scaffold design check for temporary works coordinators? Access Design & Safety checks scaffold, falsework and formwork designs against the latest codes of practice, including TG20:21, so you can be confident the design is safe and buildable.

Checking is about more than spotting arithmetic errors. We look at whether the design suits the actual site, whether the assumptions hold up and whether the scaffold can be built as drawn.

Scaffold Design Check for Temporary Works Coordinators: Why It Matters

A second pair of eyes on a scaffold design is not a luxury. On complex temporary works it is a requirement. Category 3 checks must be carried out by a separate organisation, and that is exactly the service we provide.

What Our Design Check Covers

  • Review of drawings and calculations against current codes including TG20:21
  • Accuracy check on every calculation
  • Assess
ment of site location and prevailing wind loads
  • Category 3 (CAT III) independent checks available
  • A clear report so you can decide your next steps
  • Why Choose Access Design & Safety

    Access Design & Safety was formed in 2010 to deliver high quality scaffold design to BS EN 12811-1, TG20 and EN 1991-1-4. We are NASC design members and associate members of the Scaffolding Association, and we hold Professional Indemnity, Public Liability and Employers Liability insurance.

    Arrange Your Scaffold Design Check

    Call Access Design & Safety on 01384 459090 or email info@designsafe.co.uk to talk through your project. We will give you straight answers and a clear quote.

    ENQUIRY FORM

    More Products

    • TG20 Compliant Scaffold Design for Commercial Projects

    • Bespoke Scaffold Design for Listed and Heritage Buildings

    • Scaffold Design Calculations for Loading Bays

    • Scaffold Design Drawings for New Build Housing Developments