Design Check When a Scaffold Design Has Been Changed
Design Check When a Scaffold Design Has Been Changed
Whether the design is one of ours or was produced by another designer, Access Design & Safety provides design check when a scaffold design has been changed with a full report at the end.
Checking is about more than spotting arithmetic errors. We look at whether the design suits the actual site, whether the assumptions hold up and whether the scaffold can be built as drawn.
Design Check When a Scaffold Design Has Been Changed: What You Need to Know
A second pair of eyes on a scaffold design is not a luxury. On complex temporary works it is a requirement. Category 3 checks must be carried out by a separate organisation, and that is exactly the service we provide.
What Our Design Check Covers
- Review of drawings and calculations against current codes including TG20:21
- Accuracy check on every calculation
- Assessment of site location and prevailing wind loads
- Category
Why Choose Access Design & Safety
Our work covers commercial, education, government and MOD, residential, transport, religious and heritage projects. We design and check across most systems, including tube and fittings, Cuplock, Kwikstage, Haki, Layher and Altrad Plettac.
Arrange Your Scaffold Design Check
To book your scaffold design check, call us on 01384 459090 or email info@designsafe.co.uk. Tell us about the job and we will take it from there.
Visit the Access Design and Safety Ltd website for more information on Design Check When a Scaffold Design Has Been Changed