Whether the design is one of ours or was produced by another designer, Access Design & Safety provides design check for underground rail temporary works with a full report at the end.

Checking is about more than spotting arithmetic errors. We look at whether the design suits the actual site, whether the assumptions hold up and whether the scaffold can be built as drawn.

Design Check for Underground Rail Temporary Works: Why It Matters

Rail work comes with its own paperwork. Scaffolds near the track or inside stations need proper submissions, and asset owners expect forms 002 and 003 to be right first time. Possession windows are short, so any delay on the design side costs real money. We have produced rail submission drawings for years and know what the reviewers look for.

What Our Design Check Covers

  • Review of drawings and calculations against current codes including TG20:21
  • Acc
uracy check on every calculation
  • Assessment of site location and prevailing wind loads
  • Category 3 (CAT III) independent checks available
  • A clear report so you can decide your next steps
  • Why Choose Access Design & Safety

    Our work covers commercial, education, government and MOD, residential, transport, religious and heritage projects. We design and check across most systems, including tube and fittings, Cuplock, Kwikstage, Haki, Layher and Altrad Plettac.

    Arrange Your Scaffold Design Check

    Call Access Design & Safety on 01384 459090 or email info@designsafe.co.uk to talk through your project. We will give you straight answers and a clear quote.

    ENQUIRY FORM

    More Products

    • TG20 Compliant Scaffold Design for Commercial Projects

    • Bespoke Scaffold Design for Listed and Heritage Buildings

    • Scaffold Design Calculations for Loading Bays

    • Scaffold Design Drawings for New Build Housing Developments