Menu

Design Check for Temporary Roof Structures

Design Check for Temporary Roof Structures

Design check for temporary roof structures from Access Design & Safety covers every element of the design, from the calculations through to how the scaffold will sit on your actual site.

A second pair of eyes on a scaffold design is not a luxury. On complex temporary works it is a requirement. Category 3 checks must be carried out by a separate organisation, and that is exactly the service we provide.

Design Check for Temporary Roof Structures: The Detail That Counts

Temporary roofs keep the weather out while work carries on underneath. They are also some of the most wind sensitive structures on any site. Uplift, sheeting, rolling sections and tie loads all need proper calculation, and the supporting scaffold has to be designed to suit.

What Our Design Check Covers

  • Review of drawings and calculations against current codes including TG20:21
  • Accuracy check on every calculation
  • Ass
essment of site location and prevailing wind loads
  • Category 3 (CAT III) independent checks available
  • A clear report so you can decide your next steps
  • Why Choose Access Design & Safety

    We are members of the NASC and associate members of the Scaffolding Association. Our lead engineers have worked across new construction, refurbishment, demolition, rail, offshore, marine, power generation and aviation maintenance.

    Arrange Your Scaffold Design Check

    Ring 01384 459090 or drop an email to info@designsafe.co.uk and one of our team will come back to you. No waffle, just the information you need.

    ENQUIRY FORM

    More Products

    • TG20 Compliant Scaffold Design for Commercial Projects

    • Bespoke Scaffold Design for Listed and Heritage Buildings

    • Scaffold Design Calculations for Loading Bays

    • Scaffold Design Drawings for New Build Housing Developments