Design Check for Power Station Scaffolds

Design Check for Power Station Scaffolds

Access Design & Safety is an NASC design member and scaffold design consultancy based in Dudley. We provide design check for power station scaffolds for contractors and temporary works coordinators across the UK.

A second pair of eyes on a scaffold design is not a luxury. On complex temporary works it is a requirement. Category 3 checks must be carried out by a separate organisation, and that is exactly the service we provide.

Design Check for Power Station Scaffolds: Where the Risk Sits

Rail work comes with its own paperwork. Scaffolds near the track or inside stations need proper submissions, and asset owners expect forms 002 and 003 to be right first time. Possession windows are short, so any delay on the design side costs real money. We have produced rail submission drawings for years and know what the reviewers look for.

What Our Design Check Covers

  • Review of drawings and calculations agains
t current codes including TG20:21
  • Accuracy check on every calculation
  • Assessment of site location and prevailing wind loads
  • Category 3 (CAT III) independent checks available
  • A clear report so you can decide your next steps
  • Why Choose Access Design & Safety

    Since 2010, Access Design & Safety has built its reputation on getting the engineering right. We are fully insured, NASC design members and associate members of the Scaffolding Association, and we work with contractors right across the UK.

    Arrange Your Scaffold Design Check

    Speak to our team on 01384 459090 or email info@designsafe.co.uk to arrange your scaffold design check. The sooner we know about the job, the smoother it goes.

    ENQUIRY FORM

    More Products

    • TG20 Compliant Scaffold Design for Commercial Projects

    • Bespoke Scaffold Design for Listed and Heritage Buildings

    • Scaffold Design Calculations for Loading Bays

    • Scaffold Design Drawings for New Build Housing Developments