CAT III Design Check for Temporary Works
CAT III Design Check for Temporary Works
Whether the design is one of ours or was produced by another designer, Access Design & Safety provides cat iii design check for temporary works with a full report at the end.
Checking is about more than spotting arithmetic errors. We look at whether the design suits the actual site, whether the assumptions hold up and whether the scaffold can be built as drawn.
CAT III Design Check for Temporary Works: Getting It Right First Time
A second pair of eyes on a scaffold design is not a luxury. On complex temporary works it is a requirement. Category 3 checks must be carried out by a separate organisation, and that is exactly the service we provide.
What Our Design Check Covers
- Review of drawings and calculations against current codes including TG20:21
- Accuracy check on every calculation
- Assessment of site location and prevailing wind loads
- Category 3 (CAT III) independent check
Why Choose Access Design & Safety
Our work covers commercial, education, government and MOD, residential, transport, religious and heritage projects. We design and check across most systems, including tube and fittings, Cuplock, Kwikstage, Haki, Layher and Altrad Plettac.
Arrange Your Scaffold Design Check
Get in touch today on 01384 459090 or at info@designsafe.co.uk. We are based in Dudley, West Midlands, and work on projects throughout the UK.
Visit the Access Design and Safety Ltd website for more information on CAT III Design Check for Temporary Works